FlexCast
America needs datacenters and the grid can't yet carry them. FlexCast predicts next week's grid load and prices and optimizes datacenter wor
America's AI buildout is stalling on the grid: new datacenters wait years to connect, and Texas SB6 now requires loads over 75 MW to shed for the grid before they can plug in at all. FlexCast turns that mandate into a win for both sides.
Advanced machine learning models trained on 5.5 years of real ERCOT data predict next week's grid stress, prices, and load hour by hour. An optimizer then re-times AI training into cheap, calm hours with deadlines and uptime as hard constraints. The grid gets a campus that sheds exactly when it matters; the datacenter gets its power bill cut.
Proven on 20 held-out months at real prices: $30.5M saved (12.2%), 510/510 deadlines kept. Cheaper for the datacenter, safer for the grid. America needs this.